So last quarter? Totally did not finish a single thing on
my list. Perhaps this is especially sad seeing as I only had
two projects there, but, since I hand piece (when I move and have space, the first thing I'm doing is buying myself a sewing machine. I even have the money set aside and I
cannot wait) I give myself leeway there. How quickly do I really expect to finish a double quilt by hand? So both of my items are carrying over.
Cameron's Quilt
 |
| the blocks all laid out |
This one is inspired by Red Pepper Quilt's Labyrinth pattern, except for the fact that I did my own math. I'm a little out of love with this right now, but my niece is crazy about it and that's who it's for. I'm just doing the sashing now and the top should be done in a week - then I need to decide if I need borders, which I probably should add and get to quilting. This is intended to be a birthday present, and given that said birthday is mid-February I have to get a move on. But let's be honest, this is going to be a slightly late birthday present.
Pillow Covers
 |
| pillows to made from random bits, mostly |
The other project on the list is some pillow covers, made using the scraps left over from my
Trip Around The World quilt that I've used to test little techniques. I used them to test the corner sections of the blocks for Cami's quilt, and more recently I've been testing some flying geese techniques for something I plan on making for my brother. Since I have tons of co-ordinating scraps, I figure that these can eventually become pillows for our living room.
 |
I have quite a pile of co-ordinating scraps
|
Realistically, I don't actually expect the pillow covers to get done, but a girl can dream, right? Anyway I don't have too much of a space to put them for now.